Completed projects
The company NPP Energoreshenie LLC is a research and production company eoperating on the market since 2007.
LLC NPP Energoreshenie has all the necessary licenses and certificates for the performance of work:
- - License (account) No. 201329774 dated August 18, 2016, issued by the State Architectural and Construction Inspectorate for design, construction and electrical installation works;
- Certificate of Conformity No. UA 94.003.02206-19 dated 12.12.2019, issued by the State Enterprise "Ukrmetrteststandart" for testing and analysis of complex mechanical and electrical properties of products;
- Gosgorpromnadzor permission No. 18.15.30 dated January 12, 2015 and No. 4667.13.32 dated December 26, 2013 to carry out work of increased danger.
Implemented projects carried out by NPP Energoreshenie LLC during 2014 – 2019:
- 2017.Construction and installation and commissioning works at the substation 330 kV Polyana to replace the AT-2 autotransformer type ATDTSTN - 200000/330/110/10, with the replacement of relay protection and automation equipment. Cherkasy region.
- 2017-2018 Delivery of equipment, construction, electrical installation and commissioning at the Vinnitskaya 750/330/110/35 kV substation for the installation of AT-4 type ATDTsTN 125000/330/110/35, with relay protection and emergency events recorder.
- 2017-2018 Construction and installation and commissioning works at the 330 kV Substation Pervomayskaya to replace the AT-1 autotransformer typeATDTsTN250000/330/150/38, with the replacement of relay protection and automation equipment.
- 2017 Reconstruction of the electrical part of the hydraulic unit G8. Installation of electrical heating systems and other household electrical equipment. Replacement of recording devices for emergency processes of GRP 330/154 kV. Information collection system for registrars "Rekon", at the branch of "Kremenchug hydroelectric power station" of OJSC "Ukrhydroenergo".
- 2015 Reconstruction and modernization of the DZSh and 110 kV breakdown circuit breaker at the 220 kV Substation “Stryy” of SE “NEC“ Ukrenergo ”based on microprocessor protection manufactured by ABB.
- 2015 Construction, installation and commissioning works on the installation of a gas-insulated circuit breaker manufactured by Siemens and remote current transformers manufactured by ABB with the necessary equipment and materials at 220 kV Substation “Stryi” of the Western EU SE “NEC“ Ukrenergo ”.
- 2015 Construction, installation and commissioning work on the replacement of 750 kV arresters at the arrester in the L-ZAES cell F.V, with a 750 kV substation Dneprovskaya ORU-750 kV Dneprovskaya electric power plant of the National Company "Ukrenergo".
- 2016 Replacement of air circuit breakers VV-330B-2000-31.5 of connections from V-330, 4V-330 to gas-insulated circuit breakers at Substation 330 kV "Artsiz".
- 2016 . Performing technical re-equipment of outdoor switchgear-330 kV Substation 330 kV "Nezhinskaya" by replacing the B-330-2 Brovarskaya (inv. No. 86184) at the following address: ul. Franco, 271, Nizhyn, Chernihiv region.
- 2017 Carrying out the technical re-equipment of outdoor switchgear-750 kV at 750 kV Severoukrainsky substation (inventory no.556) by replacing the RBMK750M-U1 2AT and RS-750 kV arresters with surge arresters.
- 2015 Overhaul of auxiliary boards of substations 330 kV Gornaya and substation 330 kV Dnepropetrovsk
- 2012-2013 Implementation of a set of construction, installation and commissioning works on reconstruction (replacement of high-voltage equipment (air circuit breakers, current and voltage transformers), outdoor switchgear 35 kV Substation 110/35/10 Obukhov PJSC AES.
- 2015 Work on the protection of 154 kV lines (L-65 and L-67) of the Kakhovskaya HPP named after P.S. Neporozhny "PJSC" Ukrhydroenergo ".
- 2018 Installation and commissioning of a generator excitation system at Cherkasy TPP based on ABB equipment.
- 2018-2020 Installation and testing of electrical equipment at the sites of solar power plants Maydanovka (68 MW), Fursy (54 MW).
- 2019 Installation and commissioning of a generator excitation system at the Darnitskaya TPP.
- 2020 Conducting tests on electrical equipment at the sites of solar power plants PIVI Progresivka Alpha (18MV).
- 2019-2020 Performance of work at the Donbasskaya 750 kV Substation facility for the technical re-equipment of the Donbasskaya 750 kV Substation, replacement of the ShR-750 connection of the Zaporizhzhya-750 connection RODTS-110000/750 with relay protection and automation equipment.
- 2019-2020 Construction, electrical, installation and commissioning works on the installation of AT-3 type ATDTSTN 250000/330/110/35 kV at 330 kV Substation Chernivtsi with the replacement of 330 kV outdoor switchgear and 110 kV outdoor switchgear with relay protection and automation equipment.
Work is carried out with the preparation of all necessary technical documentation and commissioning of the facility.The company is equipped with highly professional installation and commissioning personnel. The total number of employees is 176 people.